TO ENSURE SAFETY
Be sure to also inform users of the following:
About used batteries
• Lithium-ion batteries are recyclable, valuable resources.
For information on used batteries, contact the place of purchase or a distributor.
About system power reset
• When the system fails to operate, it may be recovered by resetting the system power.
• After the battery is removed, approximately 1 minute is usually required for the system
power to reset.
In the case of using SM-BTR1
• Remove the battery from the battery mount. After approximately 1 minute, install the
battery.
If using SM-BTR2/BT-DN110/BT-DN110-A
• Disconnect the plug from SM-BTR2/BT-DN110/BT-DN110-A. After approximately 1 minute,
insert the plug.
Connection and communication with PC
• PC linkage devices can be used to connect a PC to the bicycle (system or components),
and an E-TUBE PROJECT can be used to carry out tasks such as customizing single
components or the whole system and updating their firmware.
If your versions of E-TUBE PROJECT software and firmware for each component are not
up to date there could be problems operating the bicycle. Check the software version
and update it to the latest one.
SM-BMR2/SM-BTR2
BT-DN110/BT-
DN110-A/BM-DN100
PC linkage device
SM-PCE1/SM-BCR2
24
E-TUBE PROJECT
Version 3.4.0 or later
Firmware
Version 3.0.0 or later
Version 4.0.0 or later