Mounting The Protected Network Station - GE MDS P21 Installation & Operation Manual

Protected network stations, equipped with mds inet series, entranet, or mercury transceivers
Table of Contents

Advertisement

20
P21/P22/P23 Protected Network Station
RSPSupply - 1-888-532-2706 - www.RSPSupply.com
http://www.RSPSupply.com/p-8464-MDS-P22-Redundant-Transceiver-Chasis-(Enet).aspx
POWER INPUT
TRANSCEIVER A
POWER INPUT
POWER
TRANSCEIVER B
ON/OFF
Figure 16. Input Power Connections (AC Units)
NOTE: The internal back-up battery (if installed) is disconnected for
shipment. To enable back-up power, remove the top cover of
the chassis and connect the battery cable to the battery control
board. See Figure 5 for details.
Figure 17. Input Power Connection (DC Units)

3.6 Mounting the Protected Network Station

The Protected Network Station can be placed on a sturdy tabletop, or
mounted in a 19 inch rack cabinet or equipment rack. Choose a
mounting location that provides easy access to the rear panel connectors
and an unobstructed view of the LED status indicators (through the rear
panel viewing slots). Figure 18 shows the dimensions of the Protected
Network Station.
Invisible place holder
GROUND STUD
Invisible place holder
ON/OFF SWITCH
DC POWER INPUT
05-4161A01, Rev. C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mds p22Mds p23

Table of Contents