Commissioning; Initial Start-Up; Recommissioning - STIEBEL ELTRON LWZ 130 Operation And Installation

Centralised ventilation unit with heat recovery
Table of Contents

Advertisement

Available languages

Available languages

INsTALLATIoN

Commissioning

Window contact
You can connect a window contact to terminal X18. The window
contact is required for passive cooling. The appliance checks
whether a window contact is connected and activated at X18.
The window contact must be an N/O contact.
10.5 Overflow apertures
Create suitable overflow apertures in the supply air area or over-
flow area. This is absolutely essential, since otherwise passive
cooling is not possible.
www.stiebel-eltron.com 
11. Commissioning
WARNING Injury
!
If the unit is switched on without the air ducts connected
and someone reaches through the air connectors into the
unit, there is a risk of injury.
Do not commission the unit until the air ducts are firmly
connected to it.
Material losses
!
Never operate the appliance without filters.
Material losses
!
Never operate the ventilation system if there are high lev-
els of dust inside the building or outside in the immediate
vicinity, as this could block the filter. Dust is created by
cutting tiles or working with plasterboard, for example.

11.1 Initial start-up

Enable fan
The fans are deactivated in the delivered condition.
f P28 : Set the parameter to "On".
f
Setting air flow rates
f Use parameters P6 to P9 to set the air flow rates for the fan
f
stages.
Date
f Set the current day of the week.
f
P80
1
2
3
4
5
6
7
Time
f Set the current time.
f
P81
00:00 - 23:59

11.2 Recommissioning

f Check whether filters are fitted in the appliance. Never oper-
f
ate the appliance without filters.
f Check whether the condensate drain hose is damaged or
f
kinked.
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
LWZ 130  |
43

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Lwz 130 enthalpie

Table of Contents