General scope of services
Components provided by customer
Components provided by the customer must be available in plenty of time so that tests can be
carried out on time. The Nuremberg Vogelweiherstrasse factory has no access to components
that are not within the PD LD scope of supply. This also applies to components ordered from
other Siemens' Groups. The technical data for these components is required at the latest eight
weeks before the start of the acceptance test, e.g.:
● Dimensions
● Weights
● Energy Requirement
● Interfaces
Location of the customer acceptance
All customer acceptance tests in the test fields for drives are performed as part of the
manufacturing process.
Note
Limited number of persons in the test field
For safety reasons, the number of persons in the test field is limited. In addition to the regional
sales partner, only two persons from the customer are permitted in the test field at the same
time.
Note
Test without load motors or multipulse infeeds via transformers in the test field
Some tests are simulated or performed in test mode with limited rated data.
Note
Tests with the customer's own cooling units or excitation equipment
If the customer's own cooling units or excitation equipment are to be tested, a system test can
be ordered with option F97.
SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
10
N30 N35 N44 N75 M08 U10 Y15
Reference Manual Rev.201902141441 GH180

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents