Plug The Line Cord Into An Outlet; Performance Check (Prior To Installing Tubing) - Siemens Hematek Operating Manual

Slide stainer
Table of Contents

Advertisement

2. Adjust the two feet located under the front corners of the instrument to raise or lower
the instrument to a level position.
Figure 2-1. Leveling the Instrument
3. Observe the circular bubble level to indicate when the feet have been properly
adjusted and the instrument is level. The bubble in the level should be centered within
the inscribed circle.
NOTE:
If necessary, make a final leveling check and adjustment by watching the flow of the waste
fluids during staining. Fluids should flow evenly to the drain hole at the left-front corner
of the waste trough.

Plug the Line Cord into an Outlet

CAUTION
Be sure the outlet supplies the proper voltage for your instrument. Refer to the rating label
located on the rear of the instrument to determine the proper voltage rating
Plug the appropriate end of the line cord into the instrument and the other end into an
appropriately grounded AC electrical outlet.

Performance Check (Prior to Installing Tubing)

1. Turn the instrument on by pressing the
power module at the rear of the instrument, to the
The green
revolves.
2. Inspect the slide dryer area for noticeable airflow.
3. Place five blank slides into the grooves on the right side of the conveyor spirals.
Section 2: Installation, Page 2—5
light illuminates, the fan starts, and the conveyor spirals slowly
POWER
switch, located on the left side of the
ON / OFF
position.
ON

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents