Installation

Door Closures

The compact air-handling unit service doors are equipped with
safety closures. When the door handle is moved down, the safety
closure keeps the doors just ajar. To fully open the door, the door
handle must be moved back to the horizontal position. Then the
door is released. To close the door, proceed in the reverse order of
steps. Each door is equipped with one lockable closer.
Figure 4 – Safety door lock

Pre-installation Inspection

Prior to installation, the following must be checked:
Intactness of the delivery (completeness according to the
bill of delivery)
Volubility of rotary components (fans, dampers, rotary heat
exchanger)
Parameters of the power supply and connected energy
media sources. Any fault must be removed before starting the
installation.

Identification of Air-handling Unit Components

The association to the particular purchase order number is
indicated on the name plate of the CAKE compact air-handling
unit or of each block (if the unit is delivered disassembled), i.e. the
device number or block position number. The name plate is visibly
situated on the service side of the unit.

Base Frame

The base frame's adjustable feet are protected by corner covers
intended only for the transport and handling of the unit. There
covers should be removed after installation.

Assembly of Air-handling Unit Sections

The basic version of the compact air-handling unit is delivered
assembled. If the compact air-handling unit is delivered disassem-
bled, the individual parts of the unit are assembled on the site,
i.e., the base frames are connected first and then the blocks are
connected together. For the recommended installation procedure
of the frame adjustable or fixed legs, refer to the appendix to this
document. The centre block of the disassembled unit is delivered
including the base frame and other parts of the compact air-hand-
ling unit are delivered with the base frames and block separated,
please see the picture.

Unit Alignment

Place the unit as close to the installation site as possible*
and remove the cover plate from the base frame.
6
Set the unit in the installation site* and check the prescri-
bed distances from walls*. If the unit is being assembled from
separate blocks, perform the assembly in accordance with the
following chapter "Assembly of Air-handling Unit Sections".
Install or check the anti-vibration damping of the unit from
the floor or supporting structure.
Check the unit adjustment to the level plane.
Check the air-handling outputs for proper connection.
Check the upper terminal boxes and media outputs for free
access.
Check the free space around the condensate drainage out-
put neck under the unit.
Check the minimum service space for free opening of the
doors (see the chapter "Service Access"). .
Figure 5 – Delivery of disassembled unit
Figure 6 – Application of the sealing on the contact surfaces
Base Frame Assembly
Figure 7 – Base frame assembly
Connection using the M6x20 Allen screws. To For installation
it is necessary to use an Allen wrench, size 5 (number of
screws according the width of the unit).