  • Page 1 Air-handling units CAKE...
  • Page 2: Table Of Contents

    Any changes or modifications to individual components of the CAKE air handling units which could affect its safety and proper functioning are forbidden.  Before installing and using the CAKE air handling units, it is necessary to familiarize yourself with and observe the directions and recommendations included in the following chapters.
  • Page 3: Application, Operating Conditions And Design

    Application and Operating Conditions content of chloramine (swimming pools). Insulation of the pa- nels is created by 50mm thick non-combustible mineral wool, CAKE compact units are designed for the ventilation and air- 50 kg/m -conditioning of building interiors, especially commercial facilities with low air flow rates of approx.
  • Page 4: Side Variability Of Unit Connections

    A key to access the integrated switchboard box (if included in the delivery) Packaging As standard, the transport blocks of the CAKE compact air- han- dling unit are packed in PE foil and provided with cardboard and polystyrene protecting guards. If the compact air-handling unit is delivered assembled, it is always equipped with the mounted base frame.
  • Page 5: Safety Devices

    Maintain the prescribed  CAKE compact air-handling unit blocks, as well as its sepa- degree of protection.. rate blocks, may only be stored in the same position in which Installation they are operated.
  • Page 6: Service Access

    Identification of Air-handling Unit Components The association to the particular purchase order number is indicated on the name plate of the CAKE compact air-handling unit or of each block (if the unit is delivered disassembled), i.e. the device number or block position number. The name plate is visibly situated on the service side of the unit.
  • Page 7: Connection Of Individual Blocks

    CAKE Air-handling units Installation, Connection of Heat Exchangers Connection of Individual Blocks Rotary Heat Exchanger A rotary heat exchanger is one of the most expensive components Figure 8 – Installation of the unit to the base frame in the air-handling assembly; poor and/or incorrect installation can result in costly repairs.
  • Page 8: Steam Humidification

    Connection of Heat Exchangers, Condensate Outlet Steam Humidification draining kit must be designed in the course of the air-handling unit calculation. The standard CAKE unit condensate drainage is Steam humidification is only delivered as an accessory. Steam always in negative pressure.
  • Page 9: Wiring

    Installation and Operating Instructions of individual  a prepared terminal box on the top of the unit casing (CAKE pieces of equipment (frequency converters, pressure and version with an integrated control unit);...
  • Page 10: Sheet Metal Box For Electrical Equipment

    Wiring Sheet Metal Switchboard Box The terminals can only be accessed after opening the air-hand- ling device's service doors and removing the lid. This box is intended for installation of electrical elements. It is integrated into the interior of the compact air-handling unit Figure 17 –...
  • Page 11: Wiring Procedure

    If the delivery includes an air flow control sensor, it is fitted inside Control Unit and Control Unit Communication the unit. As an option, preparation for non Remak sensor installa- A separate manual is provided for the control unit. tion inside the unit is offered. Holes in the doors are prepared for its connection.
  • Page 12: Rotary Regenerator

    Commissioning Preparation and Commissioning Preparation for Commissioning Settings are made in the device or in the control unit, depending on the type of device. To increase sensing accuracy, a range of Inspection before First Start-Up, the measured pressure is set in the device. The required setting General Routines and Checks values are specified in the technical documentation delivered with each device.
  • Page 13: Commissioning - Inspection

    CAKE Air-handling units Commissioning, Checks Plate Heat Exchanger  The connecting piping of the heater must be insulated so its surface temperature will not exceed +60 °C.  Check the exchanger fins for damage.  Check the bypass damper functionality...
  • Page 14: Checks During First Start-Up

    Regular Inspections of the unit) and, if needed, balance the fan, refer to the section  Inspection, checking and maintenance schedule, including a Unit First Start Inspection. list of checking steps, and their recording  Check the impeller for cleanliness. ...
  • Page 15: Check Of Cooling And Heating Circuit Liquids

    CAKE Air-handling units Regular Inspections  During the first several hours of operation: Check the water Figure 23 – Centre pillar replacement conductivity (min. 5 refills per water exchange cycle, sparking and max. current checking), check the cylinders for condition (water leakage) and operation and check the tightening of electrical connections.
  • Page 16: Service And Disposal

    EU Spare parts are not included in the air-handling unit delivery. If any spare parts are needed, they can be ordered from REMAK Observe the applicable local environmental a.s. or the regional distributor. In your order, specify the unit serial protection and waste disposal regulations.
  • Page 17 CAKE Air-handling units Notes...
  • Page 20 REMAK a.s. Zuberská 2601, CZ–756 61 Rožnov pod Radhoštěm, tel.: +420 571 877 778, fax: +420 571 877 777, email: remak@remak.eu, internet: www.remak.eu...