Inspection On Arrival - ABB HD4/R Installation And Operating Instructions Manual

Medium voltage products
Table of Contents

Advertisement

2. Inspection on arrival

Before proceeding with any operation, al-
ways make sure that the springs of the oper-
ating mechanism are discharged and that the
apparatus is in the open position.
As soon as it arrives, check the condition of the apparatus, that
the packing is undamaged and that the nameplate data (see
fig. 1) correspond to the information in the order confirmation
sent by ABB and in the shipping note.
Also make sure that the supply includes all the materials
described in the shipping note and the lever for loading the
springs of the operating mechanism in the manual mode.
Should any damage or irregularity be noted in the supply on
unpacking, notify ABB (directly or through the agent or supplier)
as soon as possible and in any case within five days of receipt.
The apparatus is only supplied with the accessories specified at
the time of ordering and validated in the order confirmation sent
by ABB.
A
1
3
4
B
5
6
Figure 1
The following documents accompany the apparatus when it is
shipped:
Instruction manual (this document)
Test certificate
Identification label
Fiscal copy of the shipping notification
Wiring diagram.
Other documents, sent prior to shipment of the apparatus, are:
Order confirmation
Original shipping notification
Any drawings or documents referring to special configura-
tions/conditions.
2
Key
Circuit-breaker rating plate
A
B
Operating mechanism rating plate
1
Type of apparatus
Symbols indicating compliance with Standards
2
3
Serial number
4
Circuit-breaker specifications
Characteristics of the operating mechanism auxiliaries
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hd4/sHd4/uniairHd4/r-secHd4/unimix

Table of Contents