Meridian 112BST Operator's Manual page 31

Bulk seed tender
Hide thumbs Also See for 112BST:
Table of Contents

Advertisement

IMPORTANT
Before raising the auger tube, make sure the
electrical control cable is not wrapped around
the auger support post. If the cable is not able to
move freely, it can be damaged when the auger
tube is lifted into place.
7. Raise the auger tube by pushing it upward,
usingthedeliveryspout.Asmallgas‑filled
shock will assist in raising the auger tube.
8. Lock the auger tube to the seed tender using
the over-center clamp.
PERSONAL INJURY HAZARD
Locking the clamp of the auger tube
requires the operator to stand on the
fender. Use caution and do not slip
or fall when climbing on or off of the
seed tender.
18433
9. Place the delivery spout onto the delivery
spout storage bracket.
CAUTION
31

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 112BST and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents