Mitsubishi Electric MXZ-2C20NA2-U1 Service Manual page 113

Outdoor unit
Hide thumbs Also See for MXZ-2C20NA2-U1:
Table of Contents

Advertisement

OPERATING PROCEDURE
(1) Remove the top panel, the service panel, and the front
panel (Refer to section 1).
(2) Disconnect the power supply cord and indoor/outdoor
connecting wires.
(3) Disconnect the connector of CNF1 on the outdoor control
P.C. board.
(4) Remove the propeller fan.
(5) Remove the fan motor.
NOTE: The propeller fan nut is a reverse thread.
(1) Remove the top panel, the service panel and the front
panel.
(2) Disconnect the power supply cord and indoor/outdoor
connecting wires, and remove the back panel.
(3) Recover gas from the refrigerant circuit.
NOTE: Recover gas from the pipes until the pressure
gauge shows 0 PSIG.
(5) Disconnect the compressor lead wire from the terminal of
the compressor (U, V, W).
(6) Disconnect the outdoor control P.C. board connectors:
CNF1, CNTH1, CNTH2, CN63H, CN712, CN713, CN714
(
(
), CN794 (
5C42NA2), CN795 (
(7) Remove all the screws fixing the electrical parts, and
remove the electrical parts (Photo 4).
(8) Remove the propeller fan.
(9) Remove all the screws fixing the VB fixture, and remove
the VB fixture.
(10) Remove all the screws fixing the separator, and remove
the separator.
NOTE: When installing the separator, insert the tabs of the
heat exchanger into the separator.
(11) Remove all the sound proof felts.
(12) Detach all the brazed parts of the suction and discharge
pipes (Photo 11).
(13) Remove all the compressor nuts, and remove the com-
pressor (Photo 11).
(14) Detach all the brazed parts of 4-way valve and pipes.
OBH702G
), CN791, CN792, CN793
)
113
Photo 9
Screws of the outdoor fan motor
Propeller
fan
Screws of the outdoor fan motor
Photo 10
4-way valve
Brazed parts
Screw of the
VB fixture
Sound
proof felt
VB fixture
Separator
R.V. coil

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents