Establishing The Connection; Establishment Of Connection - Plant Side; Establishment Of Connection - Pc Side - BONFIGLIOLI ACTIVE Operating Instructions Manual

Teleservice kit
Hide thumbs Also See for ACTIVE:
Table of Contents

Advertisement

Available languages

Available languages

6
The linking of the devices for establishing the connection is described in the previous
chapters. Dialing is done from the PC side by configuration of the control software
VPlus.
6.1
After completion of the installation according to
inverter and the modem are to be put into operation in the following order:
1. Switch on the frequency inverter.
2. Switch on the modem. You will find the "On" button on the right side of the
6.2
Precondition:
The installation of the control software VPlus described in
configurations in the operating system have been carried out accordingly.
9
9

Establishing the Connection

Establishment of connection - plant side

The frequency inverter performs an initialization routine which is completed after
some 10 seconds.
modem.
The factory configuration of the modem is such that the connection is established
automatically on the plant side when the corresponding number is dialed.

Establishment of connection - PC side

Start the control software VPlus in order to make the teleservice settings.
Via the menu command "Edit > Settings", open the "Settings" dialog box for
configuration of the control software VPlus.
chapter 4
and
5
the frequency
chapter 5
and the
11/07
11/07

Advertisement

Chapters

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ACTIVE and is the answer not in the manual?

Questions and answers

Table of Contents