Suzuki SY413 Service Manual page 3370

Table of Contents

Advertisement

1. Rectifier holder
1. Rear end cover
2. Insulator
10) Install rectifier holder.
11) Install brush holder cover to brush holder.
12) Place the IC regulator together with the brush holder horizon-
13) Install the 5 screws until there is a clearance of approx. 1 mm
1. IC regulator
2. Brush holder
3. Rear end frame
14) Install rear end cover.
15) Install insulator and tighten B terminal inner nut to specIfied
3. B terminal inner nut
16) Make sure that rotor turns smoothly.
Tightening Torque
(a): 2.0 N·m (0.2 kg-m, 1.5 Ib-ft)
CAUTION:
When installing rectifier, check to confirm that stator
leads have enough clearance with cooling fan
blades.
tally on the rear end frame.
(0.04 in.) between the brush holder and connector.
Tightening Torque
(a): 2.0 N·m (0.2 kg-m, 1.5 lb-ft)
Tightening Torque
(a): 4.4 N·m (0.45 kg-m, 3.3 lb-ft)
torque.
Tightening Torque
(b): 3.6 N·m (0.37 kg-m, 2.7 lb-ft)
(c): 3.9 N·m (0.4 kg-m, 2.9 lb-ft)
CHARGING SYSTEM 6H-21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sy416Sy418

Table of Contents