Check Items Table After Installation - Midea Aqua Tempto Power Series Manual

Tropical air-cooled scroll chiller 50hz
Table of Contents

Advertisement

MCAC-ATSM-2014-09

5.2 Check items table after installation.

Checking item
Whether installing site
is meet for requirements
Whether water system
is meeting for
requirements
Whether electric wiring
system is meeting for
requirements
Aqua tempo power series tropical air-cooled scroll chiller 50Hz
Description
Units are fixed mounting on level base.
Ventilating space for heat exchanger at the
air side is meeting for requirement
Maintenance space is meeting for requirement.
Noise and vibration is meeting for requirement.
Sun radiation and rain or snow proof measures are
meeting for requirements.
External physical is meeting for requirement.
Pipe diameter is meeting for requirement
The length of system is meeting for requirement
Water discharge is meeting for requirement
Water quality control is meeting for requirement
Flexible tube's interface is meeting for requirement
Pressure control is meeting for requirement
Thermal insulation is meeting for requirement
Wire capacity is meeting for requirement
Switch capacity is meeting for requirement
Fuse capacity is meeting for requirement
Voltage and frequency are meeting for requirement
Connecting tightly between wires
Operation control device is meeting for requirement
Safety device is meeting for requirement
Chained control is meeting for requirement
Phase sequence of power supply is meeting for
requirement
Yes
No
183

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents