Document No. Belvedere FA DIS ASS'Y SOP
Name
:
Disassemble LCD
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Tabulator:
Alicia Chien
Standard Operation Procedure
Fig.1
Fig.2
Qty
Auditor : Kevin Lee
Ver. :
Step:
1. Disassemble LCD. (Fig.1)
2. Put bezel into material box. (Fig.2)
Holding fixture list (holding fixture standard)
Issue department:
19(1/1)
Station :
Date
:
2014/08/19
0.1
NPSU-PPE
Qty