11.0 OPERATION CHECKLIST
Monitor must be inspected for proper operation and function according to this checklist before each use. Before
flowing water check:
1) There is no obvious damage such
as missing, broken or loose parts.
2) Hose and nozzle are securely attached.
3) Both legs are fully open.
4) All three spikes are in contact
with the ground.
5) Valve handle locks when closed
and releases.
6) Inlet pivots freely.
WARNING
TASK FORCE TIPS, Inc.
MADE IN USA •www.tft.com
©Copyright Task Force Tips, Inc. 2002-2011
Locks and
unlocks
Any Blitzfire monitor failing any part of the inspection checklist is unsafe and must have
the problem corrected before use. Operating a Blitzfire that fails any of the above
inspections is a misuse of this equipment.
7) Monitor is anchored:
8) Outlet pivots smoothly in all directions.
9) Safety Shut-Off valve is operational.
(see section 2.2.3)
10) Monitor is pointed in a safe direction.
3701 Innovation Way, Valparaiso, IN 46383-9327 USA
800-348-2686 • 219-462-6161 • Fax 219-464-7155
• Tied off
• Hooked leg
• Spike hold
• Weight
LIX-630 June 22, 2011 Rev10