ABB UniGear ZS3.2 Instruction Manual page 36

Air-insulated medium voltage switchgear
Hide thumbs Also See for UniGear ZS3.2:
Table of Contents

Advertisement

36
UniGear ZS3.2
6/5 Interlock yoke
with sliding handles
which will be moved
inwards to release
the circuit-breaker
part for withdraw
from the panel.
6/6 Withdrawable
part in service
position, interlock
yoke engaged,
control wiring
pluged-in and
engaged.
6/7 Operating
accessories
6/5
51 Interlock yoke
51.1 Catch pin, spring loaded
51.2 Sliding handle
51.4 Blocking shaft (interlocking circuit-breaker and earthing switch)
6/7
122 Operating lever (for earthing switch)
128 Charging lever (for circuit-breaker)
145 Three bit key (ON-OFF) operation
146 Hand 128 145 146 122 cranck (for moving the withdrawable part)
I N S T R U C T I O N M A N U A L
128
145
51.3
51
51.2
51.4
51.1
6/6
10 Control wiring plug connector, closed
10.1 Control wiring socket
10.2 Control wiring plug
10.4 S8 /Limit switch for test position indicator
10.5 S9 /Limit switch for service position indicator
51
Interlock yoke
51.3 Guide rail (panel)
54 ON-OFF operating shaft
146
10.4
10.5
122
54
51
10
10.1
10.2

Advertisement

Table of Contents
loading

Table of Contents