ABB UniGear ZS3.2 Instruction Manual page 24

Air-insulated medium voltage switchgear
Hide thumbs Also See for UniGear ZS3.2:
Table of Contents

Advertisement

24
UniGear ZS3.2
1.5
5/4 For bolting the
UniGear ZS3.2
panels together,
threaded brushings
are provided at the
right side near to
28
the front and rear
edges of the side
walls. Adequate
bors are located at
the left hand side
of the panel
5/5 View into cable
connection
compartment max.
4 parallel cables
possible
5/6 Partial view
1.3
into the cable
connection
compartment
prepared for
connection of two
parallel cables
5/4
5/7 View into the
busbar compartment
1.3
Aperture for main earthing bar
1.5
Lifting lug
(1.9) Threaded bushing, for switchgear assembly
1.10 Bores (bushings), for switchgear assembly
1.11 Cut-out for control wiring bushing
28
Bushing plate
5/6
I N S T R U C T I O N M A N U A L
1.11
(1.9)
1.10
5/5
5/7
3.1
Tee-off conductor, busbar side
3.11 Busbar section
20.1 Spout, above
3.11
3.1
20.1