22
UniGear ZS3.2
—
5/1 Guideline
structural data for
foundation frame
on concrete floor
(for information
only)
—
5/1
A Operator aisle
B Inspection aisle
C1 Opening for power cables
C2 Opening for control cables(instead of individual openings,
continuous openings or drilled holes are possible)
E Points for fixing the switchgear panel on the floor frame
I N S T R U C T I O N M A N U A L
Only for transformer
panel
(360)
(360)
C1
1340
33
60
300
1000
(1600)
1600
B
940
940
(280)(280)
(280)(280)
C1
C1
C2
C2
M12(4X)
33
60
33
60
300
600
300
600
1200
1200
A
E
(1600)