Download Print this page

Cisco CWDM-OADM 1 Series Installation Notes page 19

Passive optical system

Advertisement

Figure 17
To network
Before removing the dust plugs and making any optical connections, observe the following guidelines:
Note
Always keep the protective dust plugs on the unplugged fiber-optic cable connectors and the
transceiver optical bores until you are ready to make a connection.
Always inspect and clean the SC connector end-faces just before making any connections. Refer to
the Tip on this page for a pointer to a fiber-optic inspection and cleaning white paper.
Always grasp the SC connector housing to plug or unplug a fiber-optic cable.
Step 2
Remove the dust plugs from the network interface cable connector and the transceiver optical bore. Save
the dust plugs for future use.
Step 3
Inspect and clean the connector's fiber-optic end-faces. Refer to the Tip below for a pointer to the
fiber-optic inspection and cleaning white paper.
For complete information on inspecting and cleaning fiber-optic connections, refer to the whitepaper at
Tip
this URL:
http://www.cisco.com/en/US/tech/tk482/tk607/technologies_white_paper09186a0080254eba.shtml
78-16565-02
Cabling a CWDM Dual Single-Channel OADM Module
CAB-SM-LCSC-1M
TX
NE TW OR
CW DM
K
-
RX
OA DM
1-
15 50
TX
MO NIT OR
WE ST
RX
TX
155 0
RX
TX
155 0
RX
LC
connector
Dual
Single-Channel
OADM module
To optional optical
spectrum analyzer
Connecting the CWDM Passive Optical System to Your System
Module
CWDM
GBIC
SC
connector
LC connector
TX
NE TW OR
K
RX
EA ST
TX
MO NIT OR
RX
TX
NE TW OR
CW DM
K
-
RX
OA DM
1-
15 70
TX
MO NIT OR
WE ST
RX
TX
To network
To optional optical
spectrum analyzer
Cisco CWDM Passive Optical System Installation Note
Module
CWDM
SFP
157 0
TX
NE TW OR
K
RX
RX
EA ST
TX
155 0
RX
TX
MO NIT OR
RX
19

Hide quick links:

Advertisement

loading