Preparation For Raising The Mast Into Position - Lightning Protection International GUARDIAN PLUS Installation Manual

Table of Contents

Advertisement

2.0 m (6.7 ft) FRP
3.0 m (10 ft)
Aluminium
Mast
Figure 32.
Preparation for Raising the
Mast into Position
With the upper termination of the HVSC Plus
completed and the FRP mast in position
it is now time to finalise the mounting
arrangement so that the mast can be raised
and secured into position.
If using the recommended installation
methods shown earlier, fit the inline
coupling to the lower mast material.
If required, fit the HVSC Plus down-
conductor through the side entry of the
inline coupling and through the FRP
mast. Refer to Figure 34.
Feed the upper termination through the
guying ring if required.
36
LIGHTNING PROTECTION INTERNATIONAL PTY LTD
GUARDIAN PLUS Terminal
Guy ring fitted
between Guardian
Plus terminal
and FRP mast
Insulated
guying
FRP
mast
Figure 33.
U Bolts
Guardian Plus
terminal
www.lpi.com.au