Hvsc Plus Downconductor Clearance Holes - Lightning Protection International GUARDIAN PLUS Installation Manual

Table of Contents

Advertisement

Pre-terminated end of HVSC Plus
hauled from the ground
to the top of the structure
Figure 7.
If the HVSC Plus downconductor has an upper termination on the outside of the drum,
it will need to be hauled up the structure with the drum staying on the ground
If the HVSC Plus downconductor has an upper termination on the inside of the drum,
then the drum has to be positioned at the top or near the top of the structure. Then the
HVSC Plus downconductor can be hauled downwards from the drum to the ground
Additional points:
Any lifting slings or ropes must be securely attached
DO NOT haul the HVSC Plus downconductor from the termination. See Figure 8
Protect the HVSC Plus downconductor at all times when it is being moved

HVSC Plus Downconductor Clearance Holes

Before running the HVSC Plus downconductor through any clearance holes, ensure that:
16
LIGHTNING PROTECTION INTERNATIONAL PTY LTD
Pre-terminated end of
HVSC Plus wound on to
the outside of the drum
Cable pre-termination and drum locations
Pre-terminated end
of HVSC Plus on the
inside end when
wound on the drum
Lower un-terminated
end to the ground
www.lpi.com.au

Advertisement

Table of Contents
loading

Table of Contents