Missing Something; G500 Interface Options - GE G500 Quick Start Manual

Substation gateway
Hide thumbs Also See for G500:
Table of Contents

Advertisement

GE Grid Solutions
The SFP's are inserted in the tray in the same order as the cages are labeled on the rear of the G500 chassis.
Note: The single notch in the tray corresponds to the SFP cage labeled 1.
The Hardware compartment also includes the Connector set which includes two power supply connectors, one Alarm connector,
one IRIG-B input and output connectors.
Note: The IRIG-B input and output connectors are keyed and can only be installed in the corresponding position.

Missing Something?

Contact
GE Customer Service
associated with your order.
Prerequisites
DS-Agile Studio's MCP Studio
Minimum Windows 7 x64, 10 x64 and 8GB Memory required for DS Agile MCP Studio

G500 Interface Options

The following connection/interface options are available after G500 first powers up.
Local KVM (Keyboard, Video, Mouse)
Front Ethernet port – Default IP address 192.168.168.81
Front USB Serial port with a baud rate 115200
GE Information
right away and we'll figure it out. Be sure to include your order number and mail address
SWM0106-1.00-0
G500 Substation Gateway,
Quick Start Guide
3

Advertisement

Table of Contents
loading

Table of Contents