Ground Ground Questions For detailed installation guide or warranty: Important www.addenergie.ca/support/documentation Consult a licensed contractor, a licensed electrician or a trained instal- ler to ensure compliance with local building codes, local regulations, 1 877 505-2674 #203 or contact us :...
Page 3
Communication Gateway Pedestal Installation Install the communication gateway prior to the commissioning of the station. • The gateway must be installed at less than 50 meters (160 ft.) in line of sight from the stations. • An outdoor installation is recommended in a PVC box. •...
Page 4
Station Head and Connertor Installation Installation of the charging station head on its base 1. Unscrew the charging port horlder 2. Remove the charging port and cable assembly : 2.1. Disconnect the three positions connector and the small black connector 2.2.