Download Print this page

Installation - Signature Hardware ROTUNDA Installation

Wall-mount faucet

Advertisement

ROTUNDA WALL-MOUNT FAUCET INSTALLATION

INSTALLATION

1. Prepare for installation by installing wood blocking
between the two studs where the faucet will mount.
Important: Take into consideration the thickness of
your finished wall materials, such as tile, when calculat-
ing measurements.
2. Mount the valve body in its prepared location. Attach
the valve body to the wood blocking using pipe clamps.
Use a level to ensure that the valve is mounted straight.
Important: Leave the protective plastic sleeves on the
valve until your finished wall is completed.
Wood Blocking
Finished Wall
3. Attach your existing water lines to the valve body.
Apply thread sealant or plumber's tape to the thread-
ed connection to ensure a watertight seal.
Hot Water Line
4. Once your finished wall has been completed,
remove the protective plastic sleeves from the valve
body.
Rotunda Wall-Mount Faucet Installation Instructions
Apply thread
sealant or
plumber's tape
Cold Water Line
2

Advertisement

loading
Need help?

Need help?

Do you have a question about the ROTUNDA and is the answer not in the manual?

Questions and answers