Daikin VRV III-S Technical Data Manual page 9

Intelligent manager manual
Hide thumbs Also See for VRV III-S:
Table of Contents

Advertisement

4
Accessories
4 - 2 DEC102A51 - Digital input / output
4 - 2 - 2 External connection diagram
DEC102A51
No.
Wiring procedure
<F1/F2> wiring between this equipment and centralized control equipment is required.
The connection to the facility equipment and setting of various switches are required.
See the "Wiring with Facility equipment" paragraph.
Connect the power supply and earth.
See the "Power Supply & Earth wiring" paragraph.
For the wiring connection and clamping method, refer to the "Wiring lead-in" paragraph.
Wiring with Facility Equipment
<Caution> The length of wiring between this equipment and facility equipment is 100m max.
Operation output
It is possible to select continuous 1 output (4 points) or instantaneous 2 output (ON/OFF pair - 2 points).
• Wiring at Continuous Output (Up to 4 facility equipments can be connected.)
DEC102A51
(Terminal size: M3.5)
Output SPEC: No-voltage "a" contact
Voltage SPEC
Maximum current
200-240V
1.5A (Resistive Load)
DC5~24V
2A (Resistive Load)
Operation input
When the contact is "Closed", "Run" is to be input. Input SPEC: No-voltage "a" contact (When the applied voltage is 20 to 30V DC and the contact is "Closed", the welding current is approx. 10mA.) For
input, use a contact for micro current. (12V DC, 1mA max.)
Abnormal input
When the contact is "Open" or "Closed", "Error" is produced. Input specifications: No-voltage "a" contact (The welding current is approx. 10mA when the applied voltage is 20 to 30V DC and the contact
is "Closed".) For input, use the contact for micro current. (12V DC, 1mA max.)
Facility equipment operating status input wiring
DEC102A51
Terminal used in case where the switch was set to "Continuous Output" (Con.) or "Instantaneous Output" (Ins.)
Facility equipment
(Up to 4 units can be connected to
single DEC102A51.)
1st equipment
2nd equipment
3rd equipment
4th equipment
Power Supply & Earth Wiring
For power supply, 1~200-240V is used. The wiring to the power terminal block (L/N) is required. The electric wire used should be 1.25 to 2.0mm
correct connections.
Connect the earth wiring to the "
8
Facility equipment operation circuit example
S1S
1~200-240V
Remote
Local
CD
Operation
command
D1~4
K1R
S2S
1~200-240V
K1R K5R
S3S
Minimum current
Q1M
10mA
10mA
K5R K3R
Facility equipment error status input wiring
DEC102A51
CM
K3R
M1~4
Facility equipment
operating status
Terminal used in the case of setting to "Continuous Output"
Run/Stop output
Operation input
terminal
terminal
CD
D1
CM
M1
CD
D2
CM
M2
CD
D3
CM
M3
CD
D4
CM
M4
2
" terminal. Use a 2.0 mm
wire.
• VRV Systems • Network Solution
Power Supply
(1~200-240V)
• Wiring at instantaneous Output (Up to 2 facility equipments can be connected.)
Output wiring for facility equipment 1
DEC102A51
D2
Stop command
1~200-240V
Local
CD
Local
stop
operation
Operation
command
D1
Q1M
Facility equipment
(Terminal size: M3.5)
protecting device
Output SPEC: No-voltage "a" contact
Q1M
Voltage SPEC
Facility
equipment
200-240V
1.5A (Resistive Load)
protecting
K4R
device
DC5~24V
CA
When the switch was set to "Ins." (Instantaneous Output), the operation
input terminals M3, M4 and abnormal input terminals A3, A4 ar not used.
K4R
A1~4
Facility equipment
error status
Facility equipment
Abnormal input
(Up to 2 units can be connected to
terminal
single DEC102A51.)
CA
A1
1st equipment
CA
A2
2nd equipment
CA
A3
When the switch was set to "Ins." (Instantaneous Output), the operation input terminals M3, M4
CA
A4
and abnormal input terminals A3, A4 are not used.
Fuse (10A)
switch
L
N
DEC102A51
facility equipment
(4 numbers max.)
Facility equipment operation circuit example
Output wiring for facility equipment 2
DEC102A51
D4
K2R
K2R
Stop command
1~200-240V
CD
Operation
command
D3
K1R
K1R
1~200-240V
K5R
(Terminal size: M3.5)
Facility
Maximum current
Minimum current
equipment
10mA
protecting
device
2A (Resistive Load)
10mA
Terminal used in the case or setting to "Instantaneous Output"
Operation
Stop output
Operation input
output terminal
terminal
CD
D1
CD
C2
CM
CD
D2
CD
C4
CM
2
. After checking tht power supply specifications, make
F1, F2
centralized
control
equipment
S1S
Remote
Local
Local
K2R
S2S
stop
Q1M
K1R K5R
S3S
Facility equipment
Local
protecting device
operation
Q1M
K5R K3R
K4R
Stop input
terminal
terminal
M1
CA
A1
M2
CA
A2
3D047624