Calibration
Integral Solenoid
Forcing the Integral Solenoid
1.
To energize solenoid valve, hold the magnetic key over
H1 for 3 secs. This will operate the actuator.
2.
To de-energize the solenoid hold the magnetic key over
H1 for 3 sec. The actuator moves to the fail-safe position
Self Calibration (Integral Solenoid)
Note: this guide only details self-calibration process for a
sensor with integral solenoid at the sensor.
For calibration via a network, please refer to the
corresponding network section of this manual.
1.
Hold the magnetic key over H2 for 6 seconds. The P1
LED indicator will turn green. M-VUE will automatically
perform a self-calibration routine. It will automatically
open and close 3 times.
2.
If the self calibration routine is successful all the LEDs
will flash green for 2 seconds and M-VUE will return to
normal run mode
3.
If the self calibration routine fails all LEDs will flash
red for 2 seconds. P1 will remain flashing waiting for
confirmation to try another calibration.
Note: If the calibration fails, the last successful calibration will
remain stored at the sensor.
www.cranecpe.com
6 s to confirm Self Calibration
Crane ChemPharma & Energy
13
Need help?
Do you have a question about the M-VUE and is the answer not in the manual?
Questions and answers