Download Print this page

Honeywell 66 Configuration Manuals page 88

Advertisement

SECTION XII
Not For Use On 66/05
(MSF1036)
MSA1027
MSAlfl29
MSFlfl19
termination
MSF1924
MSFlZ26
83
One required for each
4 MSU0402/fl451
spindles for each MSP
in a subsystem.
Two
required for each 4
spindles on a MSP
equipped with MSF1928
One per MSP for each
2 MSUOSGG units
(4 spindles)
Option in MSP only if
no MSUESGG spindles in
subsystem. To obtain
delta link when MSUGSGG
spindles are included
MSF1027 must be used
for link to FNP and
MSF1026
to
switch
prime MSP channel be-
tween 2
IOM channels
One required per MSP
Option.
DH92.
Rev.
0

Advertisement

loading

This manual is also suitable for:

66/dps