Download Print this page

Removal Of Pcbs - Daikin RKS42GVLT Service Manual

4.2/5.0/6.0/7.1 kw class

Advertisement

Removal of PCBs

4. Removal of PCBs
Procedure
Step
1
Disconnect the
connectors [S52]
[S102] from the service
monitor PCB.
2
Detach the 4 clamps
with pliers and remove
the service monitor
PCB.
3
Remove the screws of
the terminal board and
the earth wire.
12
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Procedure
[S102]
[S52]
Service monitor PCB
Clamp
Terminal board
(R16707)
(R16708)
Earth wire
(R17030)
Si00-875
Points
Preparation
Remove the electrical box
according to the "Removal of
Electrical Box".
Removal Procedure

Hide quick links:

Advertisement

loading