Step 5: Insert the expansion tube into the drilled hole. Pass the expansion screw through the
gasket and lock with a
one row.
Step 6.1: Battery power cable connection sequence:
Go through the waterproof cap→ go through the sealing ring→ go through the joint, fixed to
the copper bar with M5 nut inside of the battery.
Step 6.2: Battery
communication cable
connection sequence:
The
RJ45
connector
communication cables shall go
through the waterproof cap → go
through
the
sealing
through the joint and be inserted in
to the COM port inside of the
battery.
______________________________________________________________________
Installation
screwdriver. M4856-P is stackable with maximum of 4 batteries in
1. The waterproof connector is rotated counterclockwise
according to the installation procedure to remove the plug.
2. Use a screwdriver to remove the maintenance cover
of
the
before wiring.
3. All air switches are set to disconnect at the factory.
Please check before wiring.
ring→go
4. The waterproof joint seal should be confirmed whether
it is inserted into the plastic claw ring during installation.
Alpha ESS Co., Ltd.
Your Smart Energy
Page 15 of 29