NOTE : Use the following steps to install the oil cooled
disc type brakes. If new discs (7) are installed, soak
the discs in transmission drive train oil for one hour
prior to installation. Refer to the Operation and
Maintenance Manual for further information.
8. Put Loctite No. 17430 on the mating surfaces of
hub (8) and the transaxle housing. Install hub (8)
and bolts (10).
9. Install piston (9).
10. Install the plates and discs (7) into hub (8).
Power Train
6
7
9
8
3
11. Put Loctite No.17430 on the mating surfaces of
hub (8) and cover (6). Install bolts (5) and cover
(6).
12. Install adapter (4) and bolts (3).
13. Install bolts (1) and wheel (2).
14. Bleed the brake system. Refer to the Testing and
Adjusting Manual for further information.
15. Remove tooling (A).
49
6
5
8
4
Disassembly & Assembly

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

B25s-2B30s-2Bc20s-2Bc25s-2Bc30s-2

Table of Contents