Daewoo B20S-2 Specifications Systems Operation Testing & Adjusting Disassembly & Assembly page 48

Lift trucks power train
Hide thumbs Also See for B20S-2:
Table of Contents

Advertisement

8
3. Install shaft assembly (8) in the housing.
4. Put Loctite No.242 Thread Sealant on th threads
of the bolts that hold the spindle.
5. Put spindle (7) in position, and install bolts (6) that
hold it. Tighten the bolts to a torque of 115 L 14
NIm (85 L 10 lbIft).
5
6. Install bearing (5) on the spindle.
Power Train
6
1
7
7. Put hub and cover assembly (4) in position on the
housing, and install the bolts that hold it. Tighten
the bolts to a torque of 55 L 10 NIm (41 L 7 lbIft).
8. Install bearing (2) locking washer (1) and nut (3)
on the spindle.
9. With tool (A), tighten nut (3) slowly to 135 NIm
(100 lbIft) while the hub is turned to put the
bearings in position.
10. Loosen nut (3) completely, and tighten it again to
a torque of 50 L 5 NIm (37 L 4 lbIft).
11. Bend one of the tabs in washer (1) to hold the nut
in position.
End By:
a. Install brakes.
47
2
3
Disassembly & Assembly
4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

B25s-2B30s-2Bc20s-2Bc25s-2Bc30s-2

Table of Contents