Daewoo B20S-2 Specifications Systems Operation Testing & Adjusting Disassembly & Assembly page 47

Lift trucks power train
Hide thumbs Also See for B20S-2:
Table of Contents

Advertisement

8
5. Remove bolts (6), and remove spindle (7).
6. Remove shaft assembly (8).
9
7. Remove lip seal (9) from the housing.
8. Remove the retainer and bearing (10) from the
shaft.
Power Train
Install Final Drives And Hubs
6
Spanner Wrench
Driver set
7
1. Install bearing (10) with a press. Heat the retainer
to 317 to 427°C (700 to 801°F) and install it
against bearing (10) with a press.
10
2. Install lip seal (9) in the housing with tool group
(B) and a suitable press. Install the seal with the
lip toward the inside.
46
Tools Needed
9
Disassembly & Assembly
A
B
1
1
10

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

B25s-2B30s-2Bc20s-2Bc25s-2Bc30s-2

Table of Contents