Daewoo B20S-2 Specifications Systems Operation Testing & Adjusting Disassembly & Assembly page 35

Lift trucks power train
Hide thumbs Also See for B20S-2:
Table of Contents

Advertisement

Cushion Tire Mounting
Tighten the cushion tire wheel mounting bolts (1) to
a torque of ..................270 L 25 N¥m (200 L 18 lb¥ft)
Pneumatic Tire Mounting
Tighten the pneumatic tire wheel nuts (2) to a torque
of ................................644 L 34 N¥m (475 L 25 lb¥ft)
Use ÒcrisscrossÓ procedure to tighten the nuts.
Power Train
BC Series
BC20S-2, BC25S-2
The drive tire must be installed as shown below.
Failure to do so will decrease the stability of the lift
truck and can cause injury to the operator.
Install the tire so that the edge of the tire is even with
the outside edge of the wheel.
34
WARNING
Specifications

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

B25s-2B30s-2Bc20s-2Bc25s-2Bc30s-2

Table of Contents