Daewoo B20S-2 Specifications Systems Operation Testing & Adjusting Disassembly & Assembly page 41

Lift trucks power train
Hide thumbs Also See for B20S-2:
Table of Contents

Advertisement

6
8
3. Use a hammer and punch to remove roll pin (6)
from the carrier. Remove pin (8), side gears (7)
and the thrust washers.
4. Remove axle gears (9) and the thrust washers. If
bearing cones (5) need to be replaced, use tool
(B) and a press to remove them from the carrier.
5. Remove cover (10) from the housing assembly.
Remove the cap from over pinion nut (11). Bend
the lockwasher away from nut (11). Remove nut
(11) with tool (C). Remove the lockwasher and
washer.
Power Train
5
12
7
9
IDCD356S
6. Remove outer bearing cone (17), shims (23) and
7. If necessary, remove inner bearing cone (13) from
8. If necessary, remove bearing cups (18) and (20)
10
11
9. Remove the snap ring (24) from the gear shaft
10. If necessary, remove the bearings (25) from the
40
21
13
18
ring (22) from the pinion shaft. Pull pinion shaft
(12) out of gear (15) and the housing assembly.
Remove ring (21) from the pinion shaft. Remove
the gear from the side of the housing assembly
that cover (10) was removed from.
the pinion shaft with a press.
and shim (19) from the housing assembly.
25
24
(26).
gear shaft (26) with a bearing puller.
15 22 17
19
20
23
26
Disassembly & Assembly
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

B25s-2B30s-2Bc20s-2Bc25s-2Bc30s-2

Table of Contents