Equipment Checklist; Package Contents; Optional Rack-Mounting Equipment; Figure 3-1 Rj-45 Connections - SMC Networks TIGERSTACK II SMC8926EM Installation Manual

10/100/1000 24/48-port stackable layer 3 gigabit switch
Hide thumbs Also See for TIGERSTACK II SMC8926EM:
Table of Contents

Advertisement

3
Installing the Switch

Equipment Checklist

After unpacking the switch, check the contents to be sure you have received all the
components. Then, before beginning the installation, be sure you have all other
necessary installation equipment.

Package Contents

• 24- or 48-port Gigabit Ethernet Switch (SMC8926EM or SMC8950EM)
• Four adhesive foot pads
• Bracket Mounting Kit containing two brackets and eight screws for attaching the
brackets to the switch
• Power cord—either US, Continental Europe or UK
• Console cable (RJ-45 to RS-232)
• This Installation Guide
• Management Guide CD

Optional Rack-Mounting Equipment

If you plan to rack-mount the switches, be sure to have the following equipment
available:
• Four mounting screws for each device you plan to install in a rack—these are not
included
• A screwdriver (Phillips or flathead, depending on the type of screws used)
3-2
RJ-45 Connector

Figure 3-1 RJ-45 Connections

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TIGERSTACK II SMC8926EM and is the answer not in the manual?

Questions and answers

Table of Contents