I
NSTALLING THE
Connecting Switches in a Stack
1 3
1 3
1 4
1 4
1 3
1 3
1 5
1 5
1 6
1 6
1 7
1 7
1 8
1 8
1 4
1 4
1 3
1 3
1 4
1 4
1 3
1 3
1 5
1 5
1 6
1 6
1 7
1 7
1 8
1 8
1 4
1 4
1 3
1 3
1 4
1 4
1 3
1 3
1 5
1 5
1 6
1 6
1 7
1 7
1 8
1 8
1 4
1 4
Note: The stacking transceiver must only be installed in the port 25 SFP
slot.
To connect up to eight switches in a stack, perform the following steps:
1. Install SFP stacking transceivers into the port 25 slot for each switch
in the stack.
2. Plug one end of a stack cable into the Tx (top) port of the top unit
3. Plug the other end of the stack cable into the Rx (bottom) port of the
next unit.
4. Repeat steps 1 and 2 for each unit in the stack. Form a simple chain
starting at the Tx port on the top unit and ending at the Rx port on the
bottom unit (stacking up to 8 units).
3-10
S
WITCH
1 9
1 9
2 0
2 0
2 1
2 1
2 2
2 2
2 3
2 3
2 4
2 4
2 3
2 3
2 5
2 5
2 6
2 6
2 4
2 4
Li nk
Li nk
/A ct
/A ct
T x
P oE
P oE
R x
25
25
26
26
1 9
1 9
2 0
2 0
2 1
2 1
2 2
2 2
2 3
2 3
2 4
2 4
2 3
2 3
2 5
2 5
2 6
2 6
2 4
2 4
Li nk
Li nk
/A ct
/A ct
T x
P oE
P oE
R x
25
25
26
26
1 9
1 9
2 0
2 0
2 1
2 1
2 2
2 2
2 3
2 3
2 4
2 4
2 3
2 3
2 5
2 5
2 6
2 6
2 4
2 4
Li nk
Li nk
/A ct
/A ct
T x
P oE
P oE
R x
25
25
26
26
Figure 3-7 Connecting Switches in a Stack
P W R
P W R
D ia g
D ia g
S ta ck
S ta ck
in g
in g
M od
M od
e
e
P oE
P oE
/L in k
/L in k
P W R
P W R
D ia g
D ia g
S ta ck
S ta ck
in g
in g
M od
M od
e
e
P oE
P oE
/L in k
/L in k
P W R
P W R
D ia g
D ia g
S ta ck
S ta ck
in g
in g
M od
M od
e
e
P oE
P oE
/L in k
/L in k
Stack Master
Slave
Slave
Need help?
Do you have a question about the SMC TigerStack III SMC6826MPE and is the answer not in the manual?
Questions and answers