Summary of Contents for BLAUBERG Ventilatoren Freshbox 100
Page 1
Freshbox 100 INSTALLATION GUIDE AIR HANDLING UNIT WITH HEAT RECOVERY FRESHBOX 100 Tools required Pencil Scotch Tape Mounting foam Drill Screwdriver Dowel 4 pcs Screws 4 pcs Ø 6 mm 200 mm " 590 mm " 257 mm " 400 mm "...
Page 2
Freshbox 100 Minimum distances from the unit to the surfaces min 300 mm min 300 mm min 11 / " min 11 / " Mounting template ADDITIONAL HOLE! DRILL UPON CUSTOMER’S REQUEST ONLY! ADDITIONAL HOLE! DRILL UPON CUSTOMER’S REQUEST ONLY! Ø...
Page 3
Freshbox 100 Unit mounting BEFORE MOUNTING MAKE SURE THE CASING DOES NOT CONTAIN ANY FOREIGN OBJECTS (E.G. FOIL, PAPER). THE UNIT MUST BE MOUNTED ON A PLANE SURFACE. MOUNTING OF THE UNIT TO AN UNEVEN SURFACE CAN LEAD TO THE UNIT CASING DISTORTION AND OPERATION DISTURBANCE.
Page 4
Freshbox 100 3. Fix the mounting template on the wall. Insert round air ducts in the corresponding holes of the mounting template. Install the air duct with the minimum slope of 3° for condensate removal. To install the unit with an additional spigot insert the...
Page 5
Freshbox 100 6. Insert the drain pipe and unit spigots into the corresponding wall-mounted air ducts. Open the unit door and remove the heat exchanger. Remove the magnetic plug from the exhaust grille if an additional extract spigot is not installed.
Page 6
Freshbox 100 Connection to power mains DISCONNECT THE UNIT FROM POWER MAINS PRIOR TO ANY OPERATIONS. THE UNIT MUST BE CONNECTED TO POWER MAINS BY A QUALIFIED ELECTRICIAN. THE RATED ELECTRICAL PARAMETERS OF THE UNIT ARE SHOWN ON THE RATING PLATE.