7. COMMISSIONING OF THE DEVICE

After your device is installed according to abovementioned instructions, make Hoşseven
Authorized Service do commissioning operations. Otherwise, your device will be outside of
scope of warranty.
Hoşseven is entitled to not carry out commissioning operations until electricity, gas
connections missing and/or faults are eliminated for installation, electricity and gas
connections, which are not complying with Hoşseven service installation instructions. After
commissioning of device, the issues regarding to usage of device must be learned from
Authorized Service.
Make your Guarantee Certificate to be approved by Authorized Service Station, where you
bought your device or which commissioned your device for the purpose of your guarantee
certificate will be valid. Guarantee Certificate is located in the back cover of this manual. When
gas smell is available in the environment, where your device is located, turn off gas valve, tube
and regulator is available, open door and windows. Do not use lighter, matches, electric
switches and phone.
8. OPERATION OF APPLIANCE
Before operating stove, make device installed as specified in the mounting section of
instruction manual. Carry out necessary leakage controls after installation. Turn on gas supply
tap of your device after making sure that device is fully connected to gas line. The stove is
equipped with a room thermostat. The thermostat button is on the left side of the stove.
Information is available in the figure on thermostat button.
0: turn off
*: ignition and pilot
1: minimum heating
2-6 thermostat
Detection intermediate points
7: maximum heating
Figure -A
Thermostat switch status
Approximate ambient
temperature (° C)
Table-1
1
2
3
13
17
21
Figure-A1
Figure -A2
4
5
25
28
12
Figure -A3
26
7
32
35