Setup And Installation - Belkin AP51300fc10-BLK User Manual

Belkin ups system with purefilter user manual
Table of Contents

Advertisement

Available languages

Available languages

Setup and Installation

There is always an air of excitement to quickly set up and use new
products. Of course, we're glad you are excited about your AVU1500, but
rushing the setup could actually waste more time and cause frustration.
Give yourself time and go through the setup procedure methodically to
stay in control, improve setup accuracy, and ensure satisfaction when you
are finished.
Setup involves these basic steps:
Step
1. Prepare
2. Charge Battery
3. Plan
4. Install
5. Program
6. Connect Cables
7. Test Your Setup
Approximate
Tools and Notes
Time
10 min.
12 hours
Battery must charge before
max
using unit
20–30 min.
Power planner worksheet
(included on page 23)
10 min.
If rack-mounting, you will need
if rack-
the included front rack-mount
mounting
brackets, the Belkin PureAV
Rack-Mount Rail Kit (part
number AP00001—sold
separately), and a Phillips-head
screwdriver. Note: Screws for
mounting the AVU1500 to the
equipment rack itself are not
provided as they are made
specifically for the particular
equipment rack that you own.
Contact the rack manufacturer
if you do not have the correct
mounting screws.
5–10 min.
15–20 min.
Cable labels (included),
additional coaxial cables, cable
management "stuff" (e.g.,
twist-ties).
5 min.
22
®
®

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Avu1500

Table of Contents