Daikin FTKS09HV2S Service Manual page 24

Removal procedure, 2.0/2.5/3.5/4.6 kw class, 9000/12000 btu/h class
Table of Contents

Advertisement

Removal of PCBs (Pattern 2)
Step
9
Detach the signal
receiver unit.
Reverse the signal
10
receiver unit.
Detach the display
11
PCB. (4 hooks)
Reverse the display
12
PCB and disconnect
the connector [S49].
22
Procedure
Signal receiver
unit
[S49]
Points
(R13115)
(R13116)
Display
PCB
(R13117)
[S49]: control PCB
(R13118)
Si041137
Removal Procedure

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents