24. For water-cooled units, make water
connections (Fig. 17)
25. For lever-operated dispensers, remove
and rotate ice switch on back of splash
panel 180° (Fig. 18).
26. Move splash panel into position, connect
water line to water dispense solenoid,
turn on water to solenoid and attach
splash panel.
27. Start up machine and check for proper
operation. Restore power and water to
machine.
28. Sanitize machine prior to use. See
appropriate Operation and Service
manual shipped with the unit.
Maestro Plus P425/CP425/EP425 Ice Machine for Symphony FB, CT, and CI Dispensers
Fig. 17
Fig. 18
29