Download Print this page

Follett Maestro Plus P425 Installation Instructions Manual page 17

Module into follett symphony fb; follett symphony ct; follett symphony ci

Advertisement

14. Secure with clamp (Fig. 11.1).
Note: Clamp must be oriented as shown
in order for the insulation to be placed
properly.
15. Install compression nozzle insulation
(Fig. 11.2).
16. Install top bearing insulation (Fig. 11.3).
17. Install supplied drain tube onto drain
solenoid (Fig. 12.1) and evaporator drain
pan (Fig. 12.2).
Note: Use the long tube (01055540) for
110 models and the shorter tube
(01055185) for 25/50 models.
Maestro Plus P425/CP425/EP425 Ice Machine for Symphony FB, CT, and CI Dispensers
Fig. 11
3
Fig. 12
2
1
1
2
17

Advertisement

loading