12. Secure with clamp (Fig. 8.1).
Note: Clamp must be oriented as shown
in order for the insulation to be placed
properly.
13. Install compression nozzle insulation
(Fig. 8.2).
14. Install top bearing insulation (Fig. 8.3).
15. Attach module water tube to existing "T"
fitting (Fig. 9).
Maestro Plus P425/CP425/EP425 Ice Machine for Symphony FB, CT, and CI Dispensers
Fig. 8
3
Fig. 9
2
1
25