Emerson El-O-Matic ELQ Series Installation, Operation & Maintenance Manual page 6

Table of Contents

Advertisement

Available languages

Available languages

TM
2.3
Operation times
Operation times are nominal. The actual operation
time will vary depending on the torque characteristic
of the valve. For other operating times see speed
control option.
B = 100%
Torque
0
Butterfly valve
B = 100%
Torque
0
B = 100%
Torque
0
2.3.1 Torque characteristics of valves
B = Break torque
R = Run torque
S = Seating torque
6
Installation Operation & Maintenance manual ELQ
Ball valve
S = 60%
R = 30%
90°
0
Rotation
S = 80%
R = 20%
90°
0
Rotation
Plug valve
R/S = 90%
90°
0
Rotation
table 2.2 Operating time (in sec.)
ELQ 100
ELQ 200
ELQ 300
ELQ 500
ELQ 800
DOC.55.EDN Rev: E
October 2012
No
Maximum
load
load
6
10
8
14
13
18
17
22
28
36

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Elq 100Elq 300Elq 200Elq 500Elq 800

Table of Contents