Step 16 - Fan Speed Set Up - Carrier WeatherMaker 48FC04-07 Installation Instructions Manual

Single package rooftop gas heating/electric cooling unit with puron r-410a refrigerant
Table of Contents

Advertisement

Step 16 — Fan Speed Set Up
UNITS WITH ELECTRO-MECHANICAL CONTROLS
The Fan Speed set up controls are located on the lower
section of the Unit Control Board (UCB). See Fig. 55 loca-
tion on 3 phase voltage units or Fig. 56 for location on single
phase voltage units.
1.
Check the job specifications for the CFM (cubic feet per
minute) and ESP (external static pressure) required.
2.
Using the chart on the Fan Speed Set Up labels (see
Fig. 58), calculate the Vdc from the CFM and ESP for
the base unit plus any field accessories (as listed on the
label).
NOTE: The Fan Speed Set Up labels are located on the High
Voltage cover in the Control Box.
3.
Connect a multimeter to the Vdc terminals on the UCB.
4.
Set the Range Switch to either A, B, or C per the Switch
Range table.
5.
Using a straight blade screwdriver turn the Vdc control
dial to fine tune the Vdc reading.
6.
Record the reading in the Field Setting field.
Fig. 55 — UCB Fan Speed Controls - 3-Phase Units
FAN SPEED SET UP CONTROLS
Fig. 56 — UCB Fan Speed Controls - Single Phase
NOTE: On single phase units, the approximate static pressure of
the ductwork must be set for optimal unit efficiency. The unit is
factory set for greater than 1.0 in. wg. If the external static pres-
sure is less than 1.0 in. wg, slide switch 1 on the 5-pin DIP to the
"ON" position. See Fig. 57.
SWITCH 1
5-PIN DIP
Fig. 57 — Detail – 5-Pin DIP Switch
43
FAN SPEED SET UP CONTROLS
Units

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents