3.2.4
Preparation for Installation
Installation Space
Secure sufficient working space for easy operation, cleaning, maintenance, and inspection.
Illumination
Prepare illumination devices which allow easy operation, cleaning, maintenance, and inspection.
Ventilation
If natural ventilation is insufficient, install ventilation fans according to the relevant regulations.
Piping
Suction gas inlet
Low-stage gas outlet
High-stage gas inlet
High-stage discharge gas outlet
Lubricating oil inlet for low-stage bearing (journal)
Lubricating oil inlet for High-stage bearing (journal)
Oil inlet for oil injection
Oil return inlet
Oil return outlet of low-stage
Oil return outlet of High-stage
Lubricating oil inlet for low-stage capacity control (Load)
Lubricating oil inlet for low-stage capacity control (Unload)
(Unload)
Lubrication oil inlet for high-stage capacity control (Load)
Lubrication oil inlet for high-stage capacity control (Unload)
D
20A
100
25A
125
32A
135
40A
140
150A
305
200A
350
350A
540
Figure 3-2 JIS20K Flange Dimensions of Compressor (mm)
Compound 2-stage Screw Compressor 3225**C
Table 3-1 List of Connecting Pipes (Compressor)
Item
t
g
4
51
5
61
5
71
5
76
5
216
5
261
5
480
Dimensions
JIS 20K 350A (14")
JIS 20K 200A (8")
JIS 20K 200A (8")
JIS 20K 150A (6")
JIS 20K 40A (1-1/2")
JIS 20K 25A (1")
JIS 20K 20A (3/4")
JIS 20K 32A (1-1/4")
JIS 20K 32A (1-1/4")
JIS 20K 20A (3/4")
Rc3/8
Rc3/8
Rc3/8・Rc1/2
Rc3/8
C
N-h
75
4-M12×P1.75
90
4-M16×P2
100
4-M16×P2
105
4-M16×P2
260
12-M22×P2.5
305
12-M22×P2.5
480
16-M30×P3 (Special thread)
3-4
2202MYJE-MY-C8-N_2018.02.
Chapter 3 Installation
Remarks
See Figure 3-2.
y
21
24
30
22
35
40
50
3.2 Installation Works