3.2.4

Preparation for Installation

 Installation Space
Secure sufficient working space for easy operation, cleaning, maintenance, and inspection.
 Illumination
Prepare illumination devices which allow easy operation, cleaning, maintenance, and inspection.
 Ventilation
If natural ventilation is insufficient, install ventilation fans according to the relevant regulations.
 Piping
Suction gas inlet
Low-stage gas outlet
High-stage gas inlet
High-stage discharge gas outlet
Lubricating oil inlet for low-stage bearing (journal)
Lubricating oil inlet for High-stage bearing (journal)
Oil inlet for oil injection
Oil return inlet
Oil return outlet of low-stage
Oil return outlet of High-stage
Lubricating oil inlet for low-stage capacity control (Load)
Lubricating oil inlet for low-stage capacity control (Unload)
(Unload)
Lubrication oil inlet for high-stage capacity control (Load)
Lubrication oil inlet for high-stage capacity control (Unload)
D
20A
100
25A
125
32A
135
40A
140
150A
305
200A
350
350A
540
Figure 3-2 JIS20K Flange Dimensions of Compressor (mm)
Compound 2-stage Screw Compressor 3225**C
Table 3-1 List of Connecting Pipes (Compressor)
Item
t
g
4
51
5
61
5
71
5
76
5
216
5
261
5
480
Dimensions
JIS 20K 350A (14")
JIS 20K 200A (8")
JIS 20K 200A (8")
JIS 20K 150A (6")
JIS 20K 40A (1-1/2")
JIS 20K 25A (1")
JIS 20K 20A (3/4")
JIS 20K 32A (1-1/4")
JIS 20K 32A (1-1/4")
JIS 20K 20A (3/4")
Rc3/8
Rc3/8
Rc3/8・Rc1/2
Rc3/8
C
N-h
75
4-M12×P1.75
90
4-M16×P2
100
4-M16×P2
105
4-M16×P2
260
12-M22×P2.5
305
12-M22×P2.5
480
16-M30×P3 (Special thread)
3-4
2202MYJE-MY-C8-N_2018.02.
Chapter 3 Installation
Remarks
See Figure 3-2.
y
21
24
30
22
35
40
50
3.2 Installation Works

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 3225**C Series and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF