2.6 PRE-OPERATIONAL CHECK

Before beginning installation, make certain that the area is free of overhead power lines and other
unwanted sources of electricity. Follow OSHA safety regulations when working near energized power
lines. Be sure to allow sufficient clearance on all sides of mast to allow for side sway.
This mast is for outdoor use only. Do not use in areas that have been classified as hazardous as
defined in Article 500 of the National Electric Code.
Do not use in the presence of flammable gases or liquids such as paint, gasoline or solvents. Do not
use in areas of limited ventilation or where high ambient temperatures are present. Contact with
combustible materials can cause ignition resulting in fire or explosion.
Before operating the INFLEXION, be sure that there are no overhead obstructions and that there are no power lines
within 20 feet of the mast. Visually inspect the unit for any damage. If damage is apparent, do not use the mast. Have
it serviced prior to use. Check for any objects which might obstruct motion of the mast or cause binding. Remove any
material that may hinder mast function.
2.7 FUNCTIONAL TESTS
To test the installation, proceed as follows. If any part of the testing fails, check the LEDs on the base
board as described in Section 4.4:
1. Check for proper clearance above the mast.
2. Press and hold the "Mast Up" button until the mast is fully deployed. The mast should raise to 90
then go fully deployed. There is no Auto-up feature.
3. Release the "Mast Up" button. Press and hold the "Mast Down" button. The mast should lower
o
to 90
then stow and turn power off. There is no Auto-stow feature.
TP-4976401-C