Unpacking; Attaching To Vehicle; Table 2-1 Tools And Materials Required For Installation - Will Burt INFLEXION 2.3 Installation, Operation & Maintenance Manual

Table of Contents

Advertisement

Hoist (minimum 250 lb capacity)

2.3 UNPACKING

Unpack the INFLEXION as follows:
1. Carefully open and remove all parts from shipping container.
2. Lift the unit from the shipping container by the base tube at the center of gravity of the mast shown by the
symbol.
3. Inspect for any shipping damage. If damage has occurred, notify carrier.
4. Be sure that all components are included and that the required tools are readily available.

2.4 ATTACHING TO VEHICLE

If the INFLEXION is mounted in a well on a vehicle, be certain that adequate drainage is provided. A minimum of (4)
drain holes (one per corner) at least half inch in diameter is recommended to be drilled in the well around the unit so
that water drains out of the well. While the unit has been designed to withstand adverse environmental conditions, it
cannot be submerged.
9/16" bolt holes will be needed to mount mast (Figure 2-1) to the vehicle. It is important that the surface be flat such
that the saddle and base plate are in the same plane. The areas to which the unit is mounted must be reinforced to
withstand operating loading. Torque all hardware as appropriate for its material and size. There are (3) unplugged
strain relief holes in the side of the base for cable entry.
TP-4976401-C
October 2018

Table 2-1 Tools and Materials Required for Installation

TM
INFLEXION
2-5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Inflexion 6.0Inflexion 4.5Inflexion 7.5

Table of Contents