Leister HOTWIND PREMIUM Operating Instructions Manual page 22

Hot air blower
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 16
Handle Kit
• The assembly of the handle kit may only be used by trained personnel or under their supervision.
• Handle (13) and protective tube (14) are not included in the scope of supply (see accessories).
Prior to assembly of the handle kit, switch off the unit by the main switch (2)
to cool down. Machine switches off automatically.
120
Disconnect power supply cord (1) form the line/mains.
230
• Handle kit assembly
1
Push handle (13) onto the holder (7).
2
Loosen the four fastening screws (8) (do not remove).
Push the protective tube (14) onto the heating element tube (5)
3
and move in the opening for fastening screws (8).
4
Turn the protective tube (14) as far as it will go.
5
Tighten the four fastening screws (8).
2
Changing the heating element
• Changing the heating element may only be carried out by trained personnel or under their supervision.
1
Switch off the main switch (2) and allow the unit to cool down. Machine switches off automatically.
120
2
Disconnect power supply cord (1) form the line/mains.
230
3
Remove the four fastening screws (8).
Take the heating element out of its packaging.
5
element tube (5).
7
Assemble the heating element tube (5) with four fastening screws (8).
Connect power supply cord (1) to the electrical mains. The nominal voltage indicated on the device
8
120
230
must correspond to the mains voltage.
1
5
22
3
Remove the heating element tube (5) and heating element.
4
6
2
6
4
Assemble the heating element and push on the heating
3
7
and allow the device
1
5
4
8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hotwind system

Table of Contents