Installing The Upper Pipe - Shimano SRD Assembling Manual

Footstretcher
Table of Contents

Advertisement

ROWING

(5) Installing the Upper Pipe

Procedure (5) -1: Loosen the
bolts shown by orange arrows
(↑)and slide down the Binding
(↑)and slide down the Binding
Unit. With this operation it will
be easier to manipulate the
Upper Pipe.
Procedure (5) -2: Loosen the
bolts shown by green arrows (↑)
and install the upper pipe.
© 2009 Shimano, Inc. ALL RIGHTS RESERVED
y g
(↑)
7

Advertisement

Table of Contents
loading

Table of Contents